/ 0
60%
Table of contents

Document in text mode:

ArcelorMittal Sheet PilingArcelorMittal Sheet PilingDetailed Design | The NetherlandsPart 1 | Technical & Cost AnalysisUnderground car parksMobility Infrastructure Solutions DisclaimerThe economic analysis was performed by the Dutch consulting engineers Witteveen + Bos (W+B) for ArcelorMittal in 2020. The design assumptions were determined for an underground car park in soil conditions that are encountered in downtown Amsterdam, the Netherlands. ArcelorMittal emphasizes on the fact that W+B has performed an objective and unbiased case study. The analysis is a purely hypothetical case study with its limitations on reliability on costs and techniques, since these aspects can be very dynamic in markets and different subsoils. This case study is not a project specific design, therefore neither ArcelorMittal nor Witteveen + Bos can be held responsible for choices made in specific projects based on the design or conclusions of the report prepared by W+B.The text in this brochure is a summary...